Do you want to electrify 100% of your fleet?
Fleet drivers with street parking can now charge their vehicle at home.
We organise installation of a through-pavement EV charging channel.
Your drivers start the day fully charged from low-cost off-peak energy, reducing the need to charge during the working day.
Easy home charging for all your drivers
Slim and shallow cable channel, installed in one hour
-
The Kerbo Charge channel can flex during fitting to remain flush with the surface of uneven or cambered pavements.
-
The channel is 32mm deep which means highways engineers only need to cut into the top tarmac layer.
No additional foundation or footings are required - the unit is sealed in place with HAPAS approved mortar.
Patented self closing lid design
-
The Kerbo Charge lid snaps down shut behind the charging cable as it is inserted and removed.
There are no magnets, springs or other serviceable parts. -
The main body of the channel is made from polyvinyl chloride (PVC) - a high-strength thermoplastic, and the same material used in many modern pavement utility covers.
-
Typically only 2-4 kg of CO2 to produce 1 kg, and 100% recyclable via our closed loop recycling system.
Safe for all foot and vehicle traffic
-
BSI tested to B125 - our product will withstand up to 3,600 kN/m2 pressure, over triple the highest truck tyre pressure.
They also confirmed it meets the requirements for water tightness and durability set for public drainage channels.
-
Wet PTV test value of 52, exceeding minimum requirement of 36.
Got a fleet? Let’s speak
Tell us a bit about yourself and we’ll get in touch within two working days.
How it works - three steps to bring home charging to your drivers
-

Tell us where your fleet drivers are based
-

We match your drivers to our current coverage area
-

We submit bulk applications on your behalf so your drivers can start charging from home
Our live EV charging channel trials across the UK
Kerbo Charge - a hassle free and zero cost pavement gully solution for local authorities
We’ve spent three years developing the ‘perfect’ gully solution. Co-designed with local authority (LA) partners, the design requirements are:
Highly reliable integrated self-closing lid - lid cannot be left open.
Zero cost for LA. The installation is 100% privately paid.
Tested by BSI to BS EN 1433 standard - exceeds C250 (250 kN) test
Maintenance free - a single manufactured unit with no consumable parts.
10 year product warranty
Designed in London and manufactured in the UK
-
Manufactured in England in a factory certified to ISO 9001:2008.
-
We operate a closed loop recycling system - we provide the install teams with pre-paid returns bags to send us the offcuts to be 100% recycled.
BSI tested to EN 1433
Slip tested to BS-EN-16165
-
Successfully tested by BSI to BS EN 1433:2002 (Drainage channels for vehicular and pedestrian areas). C250.
Separately slip tested to BS-EN-16165 - wet PTV value of 52 (minimum requirement is 36).
Test certificates available on request.